Start removing the shingles at the peak farthest from.
How to make shingle roof. Make sure you have enough tarps to cover exposed areas in the event it rains before you can paper over the exposed roof decking. Slip the pry bar under the damaged shingle and pry upward. Many pros shingle in a vertical line up the roof because it s much faster. Sweep the roof as clean as possible.
You should figure a two person team can only tear off and replace about 250 square feet of roofing per day. Use the chalk line to snap a straight line. Starting at the bottom of the roof map out a guideline with chalk. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
For the kind of shingles you purchase there may be a special starter row of shingles or a roll of strip material that you cut to the length of your roof. Get the right number of shingles for the job. Remove old shingles and flashing. The tools you ll need to split the shingle from the bolts include a froe metal wedge 8 12 long with an eye in one end to hold a handle and a wooden mallet made of hardwood with a knot for.
Then push the pry bar under the shingle directly above the damaged one and remove the second row of nails the same way. How to cut and install ridge capping using three tab shingles diy malarkey currently woarking at dean brandhagen chimney services http flue guru wett certi. Alternatively you can use a starting row of full sized shingles by turning them with the tabs pointing upward. Make sure you have protected your shrubs by leaning plywood on a diagonal against the house over the shrubs.
Once the nail pops up about 1 4 in remove the pry bar press the shingle down and pull out the nail. Measure the length of a shingle as it lies across the roof. Use your chalk and tape measure to mark about 12 inches up on the roof for the first set.